Changes between Version 1 and Version 2 of Research/LhARA/DesignAndIntegration/Meetings/2026/2026-10-12


Ignore:
Timestamp:
Oct 12, 2026, 12:57:29 PM (13 days ago)
Author:
wshields
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/LhARA/DesignAndIntegration/Meetings/2026/2026-10-12

    v1 v2  
    1 = Design and Integration meeting: 05 October 2026 11:00 BST =
     1= Design and Integration meeting: 12 October 2026 11:00 BST =
    22
    33'''Zoom:''' https://us06web.zoom.us/j/9842827712?pwd=Q1Nzd0RaVkc3SEtpaGJzaWZxSTh3QT09
    … …  
    1010
    1111== Notes ==
    12 Present: \\\\
    13 Absent:  \\\\
     12Present: WS MP MMC RR CW KL JP\\\\
     13Absent:  HO \\\\
    1414
    1515* Simulations:
    16         *
     16        * MP: Adding cav 2 into the model.
     17        * MMC: Oscillation in beam size when dispersion is modelled (see slides).
     18        * RR: Bayesian + Nelder-mead optimisation. Need smaller beam size, upstream possible but collimation the better option, sacrifice transmission. RR to email WS & MP to get model info.
    1719* Publications:
    18         *
     20        * No updates.
    1921* Resource planning:
    20         *
     22        * Industrial involvement high % for Tiara scheme. WS will contact JB r.e. continuing interest.
    2123* AOB
    22         *
     24        * None