= LhARA radiobiology; meeting: 09Jul26; 14:00 GMT = **ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1 Attended: KL, CW, CD, (JB) == Meeting Notes == 1. General Discussion - Robbie mentioned that beamtime might be more likely in February. - Colin believes we might be able to get some time in Autumn if we can time it correctly with other beamtime. - There is work where the SCAPA team are using AI and looking at the variability of the laser. - Colin to discuss with Robbie how to build the setup with another experiment 2. Instrumentation - General - Colin suggested filling the carousel and running 1 shot then repeating with 2 shots etc - Each cell dish would have Lanex around it or something for real-time measurement - Then we could skip the calibration stage by comparing the variation in the Lanex signal with the known variation in dose - Problems involve the number of cells needing to be collected and the time that would take - Needs discussion with bio team - SciFi - Need to actually test whether the transporting fibre will scintillate - Operate on the assumption it does not - If it does Peter has ordered hollow-fibre - Might be able to use a standrad fibre-optic connector - ICT - Colin has ICTs - 3-5ns rise time, so should see the short pulses but on the edge of visible and may be blurred out - 0.1V in signal per Amp in beam current - Beam would also need to be roughly symmetric, so has to be after the scatterer 3. Overview of Trello - Reminder plan is laid out in the google doc and can be changed - Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar - Planning next SCAPA Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?usp=sharing 4. DoNM - 23/07/26 5. AoB === Summary of actions required === In-Beam Diagnostics - **Unassigned**: Acquire a glass sheet - **Unassigned**: Get a new RCF batch and calibrate - **TP**: Testing delaminating EBT3 - **PH**: Obtain transparent fibre or an alternative method for light transport - **PH**: Obtain lens for hollow fibre tests - **CD**: Simulate energy deposited in transport fibres - **KL, CD, JMcG, PH**: Design a system to make full scifi prototypes - **KL, CD, JMcG, PH**: Make a full scifi prototype - **KL, CD, JMcG, PH**: Discuss visit to Birmingham to test SciFi - **RW, CD**: Study correlation between laser diagnostics and mean dose - **Unassigned**: Investigate how a phosphor sheet could be incorporated into the design of the cell dish - **CW**: Obtain ICTs? Bio Next Steps - **EM, CD, JMcG**: Write up technical summary of Phase 2 - **EM**: Write up a biology plan for a 2 PMQ setup - **Unassigned**: Obtain an inverted microscope - **Unassigned**: Obtain multi-chamber haemocytometers (Might be able to use Birmingham's) - **Unassigned**: Obtain a thermostat for the incubator - **MB, JP, MB**: Meet up to plan cell survival dry run and a bio plan for a 2 Quad setup - **EM**: Run controls to examine how long the cells can survive vertically Beamline Modelling - **CD**: Examine energy spectra variation - **RW, CD**: Source characterisation Alternate Beamlines - **JMcG**: Simulate BELLA - **JMcG**: Simulate ELI ----