| | 1 | = LhARA Radiobiology Meeting: 15Oct26; 14:00 BST = |
| | 2 | |
| | 3 | **ZOOM:** https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1 |
| | 4 | |
| | 5 | - Planning Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?tab=t.0 |
| | 6 | |
| | 7 | - Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar |
| | 8 | |
| | 9 | == Meeting Agenda == |
| | 10 | |
| | 11 | |
| | 12 | |
| | 13 | === Summary of actions required === |
| | 14 | |
| | 15 | In-Beam Diagnostics |
| | 16 | - **Unassigned**: Acquire a glass sheet |
| | 17 | - **Unassigned**: Get a new RCF batch and calibrate |
| | 18 | - **SdL**: Simulate energy deposited in transport fibres |
| | 19 | - **KL, CD, JMcG, SdL**: Design a system to make full scifi prototypes |
| | 20 | - **KL, CD, JMcG, SdL**: Make a full scifi prototype |
| | 21 | - **KL, CD, JMcG, SdL**: Discuss visit to Birmingham to test SciFi |
| | 22 | - **RW, CD**: Study the correlation between laser diagnostics and mean dose |
| | 23 | - **CW**: Investigate the feasibility of ICTs for our beamline |
| | 24 | - **MH**: Investigate LET detector |
| | 25 | - **CW**: Ask Narender about air fluorescence implementation |
| | 26 | - **JMcG**: Investigate using IF as a dosimeter |
| | 27 | - **RH**: Present about thin wall and diamond detectors at a Tuesday meeting |
| | 28 | |
| | 29 | Bio Next Steps |
| | 30 | - **EM, CD, JMcG**: Write up technical summary of Phase 2 |
| | 31 | - **EM, MB, RA, JMcG**: Write up a biology plan for a 2 PMQ setup |
| | 32 | - **CW, MB, RA**: Obtain an inverted microscope |
| | 33 | - **MB, RA**: Obtain multi-chamber haemocytometers |
| | 34 | - **DONE** |
| | 35 | - **RW**: Obtain a thermostat for the incubator |
| | 36 | - **EM, JMcG**: Send cells to Rosh and Marie |
| | 37 | - **EM, MB, RA, JMcG**: Run controls to examine how long the cells can survive vertically |
| | 38 | - **CW, AM**: Show Alex around SCAPA |
| | 39 | - **DONE** |
| | 40 | - **MB, RA**: Test transwells with x-rays |
| | 41 | - **CW**: Find the best meeting times for Marie |
| | 42 | - **DONE** |
| | 43 | - **CW**: Reach out to SCAPA team to confirm February is the goal |
| | 44 | - **DONE** |
| | 45 | |
| | 46 | Beamline Modelling |
| | 47 | - **CD**: Examine energy spectra variation |
| | 48 | - **JMcG, ED**: Discuss spectra fits and SCAPA source divergence |
| | 49 | |
| | 50 | Alternate Beamlines |
| | 51 | - **JMcG**: Simulate BELLA |
| | 52 | - **JMcG**: Simulate ELI |
| | 53 | - **CD**: Planning doc for ELI |
| | 54 | |
| | 55 | ---- |