wiki:Research/LhARA/RadiationBiology/Meetings/2026-10-29

Version 1 (modified by ccd24, 20 hours ago) ( diff )

--

LhARA Radiobiology Meeting: 29Oct26; 14:00 GMT

ZOOM: ​https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1

Meeting Agenda

  1. BioPrep
    • Update on cell transport
    • Colin seen the X-ray machine?
    • General Updates
  1. Instrumentation
    • RCF:
      • Tony update on new film
    • Scifi:
      • Update on prototype
      • Need to discuss visit to Birmingham
    • LET
      • Update from Mark?
    • Other detectors (Thin-wall chambers, Diamond etc)
      • Update?
  1. SCAPA
    • General Update
    • Any information on what kind of experiment we will be parasiting off
  1. Alternate Beamlines
    • ELI proposal:
      • Deadline passed
      • Next deadline most likely March/April
  1. Review Trello: ​https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
  1. DoNM
    • 12/11/26
  1. AoB
    • LhARA/CLF Workshop!!!

Summary of actions required

In-Beam Diagnostics

  • Unassigned: Acquire a glass sheet
  • Unassigned: Get a new RCF batch and calibrate
  • TP: Testing a free sample of a new film
  • SdL: Simulate energy deposited in transport fibres
  • KL, CD, JMcG, SdL: Design a system to make full scifi prototypes
  • KL, CD, JMcG, SdL: Make a full scifi prototype
  • KL, CD, JMcG, SdL: Discuss visit to Birmingham to test SciFi
  • RW, CD: Study the correlation between laser diagnostics and mean dose
  • CW: Investigate the feasibility of ICTs for our beamline
  • MH: Investigate LET detector
  • CW: Ask Narender about air fluorescence implementation (Waiting for a full plan)
  • JMcG: Investigate using IF as a dosimeter
  • RH: Present about thin wall and diamond detectors at a Tuesday meeting

Bio Next Steps

  • EM, CD, JMcG: Write up technical summary of Phase 2
  • EM, MB, RA, JMcG: Write up a biology plan for a 2 PMQ setup
  • CW, MB, RA: Obtain an inverted microscope
  • RW: Obtain a thermostat for the incubator
  • EM, JMcG, CW: Send cells to Rosh and Marie
  • EM, MB, RA, JMcG: Run controls to examine how long the cells can survive vertically
  • MB, RA: Test transwells with x-rays
  • CW: X-ray beam unflatenner

Beamline Modelling

  • CD: Examine energy spectra variation
  • JMcG, ED: Discuss spectra fits and SCAPA source divergence
  • SdL: Investigating secondary particles and pre-beam electrons in the beamline

Alternate Beamlines

  • JMcG: Simulate BELLA
  • JMcG: Simulate ELI

Note: See TracWiki for help on using the wiki.