Changes between Version 2 and Version 3 of Research/LhARA/RadiationBiology/Meetings/2026-11-12
- Timestamp:
- Nov 12, 2026, 3:29:03 PM (10 days ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/LhARA/RadiationBiology/Meetings/2026-11-12
v2 v3 7 7 - Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar 8 8 9 Attended: RH, AG, KL, CW, JMcG, SdL, CD 10 9 11 == Meeting Notes == 10 12 11 13 1. BioPrep 12 14 - Update from radiobiology meeting 15 - No major update 13 16 - Update on cell transport 14 - Colin seen the X-ray machine 17 - Colin didn't get a chance to transport 18 - Josie will be the one to coordinate this and coincide with the scifi tests at Birmingham 19 - Colin seen the X-ray machine? 20 - Not had a chance 21 - Used some money from Mark to get some consumables for the transwells 22 - Allows start on transwells 23 - There is a rough technical document 24 - **Colin to use a 3D scanner to try and reproduce the actual dimensions for documentation** 25 - Colin has obtained an inverted microscope 26 - Not quite big enough but can be adapted 15 27 16 28 2. Instrumentation 17 29 - RCF: 18 - Tonyupdate on new film30 - No update on new film 19 31 - Scifi: 20 32 - Update on prototype 21 33 - Tests with UV LED ongoing 22 34 - **Need to discuss visit to Birmingham** 23 - Talk to Chris from CLF workshop, who has put scintillating fibres in the SCAPA vacuum chamber before 35 - Email Tony about dates 36 - Need it working at Imperial first 37 - Need a conversation with Robbie to understand the layout and where things can be placed 38 - Aim for one before and at the collaboration meeting 39 - CAD drawing will be helpful 40 - Talk to Chris Armstrong from CLF workshop, who has put scintillating fibres in the SCAPA vacuum chamber before 41 - Calvin/Simon to contact him about what he learned 42 - Chris also has a paper that would be useful 24 43 - LET 25 - Update from Mark: 26 - LET update 44 - No update 27 45 - Diamond detector for electrons 28 - In-house electronics able to cope with EMP? 46 - If in chamber: 47 - In-house electronics able to cope with EMP? 48 - Needs shielding 49 - Colin suggests a PBS mounting case, which is better than an aluminium box 50 - Also worth using a throw-away detector in case of damage 51 - Needs investigation of how to get electronics out of the chamber 52 - Simple cables are fine, but higher tech cables might be tricky 53 - Richard believes there may be enough flux outside of the chamber off-axis anyways 54 - Find the CAD of the vacuum chamber and chat to Robbie 55 - Simon is completing electron simulations 56 - Ask SCAPA either for electron measurements or for PIC simulations of electron distributions 57 - Thin-window ion chamber 58 - Richard contacted XTS, and they said they can provide a wider entrance window so 28x36mm 59 - £20,000 60 - Requires discussion on recombination 61 - XTS are not concerned 62 - Provide them with an instantaneous dose rate averaged over milliseconds 29 63 - Laser diagnostics 30 64 - No correlation between backscatter and specular with dose delivered … … 33 67 3. SCAPA 34 68 - General Update 35 - Any information on what kind of experiment we will be parasiting off36 69 37 70 4. Alternate Beamlines 38 71 - ELI: 39 72 - Found a paper on the ELI beamlines 73 - Fattima is simulating the ELI beamline 74 - DRACO: 75 - Josie is simulating DRACO 76 - Most common beamline in her study of global data 77 - Lots of interesting results in the study 78 - Plan is to simualte the beamlines to better understand all the results 79 - More details to be presented on Tuesday 40 80 41 81 5. Review Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar … … 45 85 46 86 7. AoB 47 - SdL simulating the electrons and secondaries in the beamline48 87 49 88 === Summary of actions required === … … 59 98 - **DONE** 60 99 - **KL, CD, JMcG, SdL**: Discuss visit to Birmingham to test SciFi 100 - **KL, CD, JMcG, SdL**: Talk to Chris Armstrong from CLF workshop 61 101 - **RW, CD**: Study the correlation between laser diagnostics and mean dose 62 - ** CW**: Investigate the feasibility of ICTs for our beamline102 - **RW, CD**: Discuss AI model for laser diagnostics and mean dose 63 103 - **MH**: Investigate LET detector 64 104 - **CW**: Ask Narender about air fluorescence implementation (Waiting for a full plan) 65 105 - **JMcG**: Investigate using IF as a dosimeter 66 - **RH**: Present about thin wall and diamond detectors at a Tuesday meeting 106 - **RH**: Present on thin-wall and diamond detectors at a Tuesday meeting 107 - **RW, CD, RH, SdL, KL**: Discuss dimensions of SCAPA and placement of diagnostics 67 108 68 109 Bio Next Steps … … 70 111 - **EM, MB, RA, JMcG**: Write up a biology plan for a 2 PMQ setup 71 112 - **CW, MB, RA**: Obtain an inverted microscope 113 - **DONE** 72 114 - **RW**: Obtain a thermostat for the incubator 73 115 - **EM, JMcG, CW**: Send cells to Rosh and Marie … … 75 117 - **MB, RA**: Test transwells with x-rays 76 118 - **CW**: X-ray beam unflatenner 119 - **CW**: Produce a technical document on the transwells 77 120 78 121 Beamline Modelling … … 83 126 Alternate Beamlines 84 127 - **JMcG**: Simulate BELLA 85 - **JMcG**: Simulate ELI 128 - **FA**: Simulate ELI 129 - **JMcG**: Simulate DRACO 86 130 87 131 ----
