| Version 1 (modified by , 10 days ago) ( diff ) |
|---|
LhARA Radiobiology Meeting: 12Nov26; 14:00 GMT
ZOOM: https://imperial-ac-uk.zoom.us/j/98220889714?pwd=SM90vOF7BKSXoU3mD9q7OwBQo4IVB3.1
- Planning Document: https://docs.google.com/document/d/1OTARVtxhLRu02S6CLdRDB2QlGvCqDfZ3aWBifjIFs_Q/edit?tab=t.0
Meeting Notes
- BioPrep
- Update from radiobiology meeting
- Update on cell transport
- Colin seen the X-ray machine
- Instrumentation
- RCF:
- Tony update on new film
- Scifi:
- Update on prototype
- Tests with UV LED ongoing
- Need to discuss visit to Birmingham
- Talk to Chris from CLF workshop, who has put scintillating fibres in the SCAPA vacuum chamber before
- Update on prototype
- LET
- Update from Mark:
- LET update
- Update from Mark:
- Diamond detector for electrons
- In-house electronics able to cope with EMP?
- Laser diagnostics
- No correlation between backscatter and specular with dose delivered
- Talk to SCAPA team about an AI model that combines all laser diagnostics
- RCF:
- SCAPA
- General Update
- Any information on what kind of experiment we will be parasiting off
- Alternate Beamlines
- ELI:
- Found a paper on the ELI beamlines
- ELI:
- Review Trello: https://trello.com/invite/b/67587c515b0c69656ee78b48/ATTIe86f94b24e3e5884e4cb87e5ed3b89ab64321B83/poplar
- DoNM
- 26/11/26
- AoB
Summary of actions required
In-Beam Diagnostics
- Unassigned: Acquire a glass sheet
- Unassigned: Get a new RCF batch and calibrate
- TP: Testing a free sample of a new film
- SdL: Simulate energy deposited in transport fibres
- KL, CD, JMcG, SdL: Design a system to make full scifi prototypes
- DONE
- KL, CD, JMcG, SdL: Make a full scifi prototype
- DONE
- KL, CD, JMcG, SdL: Discuss visit to Birmingham to test SciFi
- RW, CD: Study the correlation between laser diagnostics and mean dose
- CW: Investigate the feasibility of ICTs for our beamline
- MH: Investigate LET detector
- CW: Ask Narender about air fluorescence implementation (Waiting for a full plan)
- JMcG: Investigate using IF as a dosimeter
- RH: Present about thin wall and diamond detectors at a Tuesday meeting
Bio Next Steps
- EM, CD, JMcG: Write up technical summary of Phase 2
- EM, MB, RA, JMcG: Write up a biology plan for a 2 PMQ setup
- CW, MB, RA: Obtain an inverted microscope
- RW: Obtain a thermostat for the incubator
- EM, JMcG, CW: Send cells to Rosh and Marie
- EM, MB, RA, JMcG: Run controls to examine how long the cells can survive vertically
- MB, RA: Test transwells with x-rays
- CW: X-ray beam unflatenner
Beamline Modelling
- CD: Examine energy spectra variation
- JMcG, ED: Discuss spectra fits and SCAPA source divergence
- SdL: Investigating secondary particles and pre-beam electrons in the beamline
Alternate Beamlines
- JMcG: Simulate BELLA
- JMcG: Simulate ELI
Note:
See TracWiki
for help on using the wiki.
