Changes between Version 18 and Version 19 of Communication/Plenary/2019-12-11
- Timestamp:
- Dec 16, 2019, 7:48:00 PM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Communication/Plenary/2019-12-11
v18 v19 23 23 || 14:00 || [raw-attachment:01-2019-12-11-Long.pptx Welcome and introduction] || K. Long (ICL)|| 24 24 || 14:15 || [raw-attachment:2019-12-11-Kurup-preCDR.pptx Preparations for the LhARA pre-CDR] || A. Kurup (ICL)|| 25 || 14:45 || [raw-attachment:.pptx Status report for the Laser driven proton and ion source work package]|| O. Ettlinger (ICL)||26 || 15:00 || [raw-attachment:.pptx Status report for the Proton and ion capture work package]|| J. Pozimski (ICL) and C. Whyte (Strathclyde)||25 || 14:45 || Status report for the Laser driven proton and ion source work package || O. Ettlinger (ICL)|| 26 || 15:00 || Status report for the Proton and ion capture work package || J. Pozimski (ICL) and C. Whyte (Strathclyde)|| 27 27 || 15:15 || [raw-attachment:Status_of_LhARA_11122019.pdf Status report for the Stage 1 and Stage 2 beam transport work packages] || J. Pasternak (ICL) and W. Shields (RHUL)|| 28 28 || 15:30 |||| '''Coffee break''' ||