Changes between Version 18 and Version 19 of Communication/Plenary/2019-12-11


Ignore:
Timestamp:
Dec 16, 2019 7:48:00 PM (4 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Communication/Plenary/2019-12-11

    v18 v19  
    2323|| 14:00 || [raw-attachment:01-2019-12-11-Long.pptx Welcome and introduction] || K. Long (ICL)||
    2424|| 14:15 || [raw-attachment:2019-12-11-Kurup-preCDR.pptx​ Preparations for the LhARA pre-CDR] || A. Kurup (ICL)||
    25 || 14:45 || [raw-attachment:.pptx Status report for the Laser driven proton and ion source work package] || O. Ettlinger (ICL)||
    26 || 15:00 || [raw-attachment:.pptx Status report for the Proton and ion capture work package] || J. Pozimski (ICL) and C. Whyte (Strathclyde)||
     25|| 14:45 || Status report for the Laser driven proton and ion source work package || O. Ettlinger (ICL)||
     26|| 15:00 || Status report for the Proton and ion capture work package || J. Pozimski (ICL) and C. Whyte (Strathclyde)||
    2727|| 15:15 || [raw-attachment:Status_of_LhARA_11122019.pdf Status report for the Stage 1 and Stage 2 beam transport work packages] || J. Pasternak (ICL) and W. Shields (RHUL)||
    2828|| 15:30 ||||  '''Coffee break''' ||