Changes between Initial Version and Version 1 of Research/DesignStudy/DesignAndIntegration/Meetings/2022/2022-10-27


Ignore:
Timestamp:
Oct 27, 2022 10:30:30 AM (18 months ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/DesignAndIntegration/Meetings/2022/2022-10-27

    v1 v1  
     1= Design and Integration meeting: 27Oct22; 10:00 BST =
     2
     3== Agenda ==
     4
     51. Simulations
     62. Transfer of data between Simulations & CAD
     73. Parameter list
     84. Apertures & magnet list
     95. LhARA schematic Layout
     106. LhARA device naming
     117. Radiation shielding studies
     128. Loss maps and subsequent energy deposition
     139. RF
     1410. Diagnostics
     1511. AOB
     16
     17----