Changes between Version 1 and Version 2 of Research/DesignStudy/ITRF/Meetings/2022/2022-03-25


Ignore:
Timestamp:
Mar 25, 2022, 9:54:24 AM (3 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/ITRF/Meetings/2022/2022-03-25

    v1 v2  
    11= ITRF/LhARA Planning Meeting !#4 =
    2 ** 24Mar22; 09:00 **
     2** 25Mar22; 09:00 **
    33
    4 == Notes ==
     4== Material ==
    55
    6 **Present: ** N. Bliss, A. Giacca, K. Long, M. Noro, H. Owen, C. Whyte
     6* Notes from 24Mar22 meeting: [wiki:Research/DesignStudy/ITRF/Meetings/2022/2022-03-24 here]
    77
    8 We discussed content of LhARA work packages as in the present proposal and the staff effort estimates prepared by NB and HO.  Much ground was covered but no concrete agreement reached.
     8== Agenda ==
    99
    10 Points noted:
    11  * MN: noted that information received from UKRI still looked like ITRF/LhARA funds could become available on the September 2022 timescale.
    12  * HO: Noted that the success in securing a reduction of overheads from 74% to ~15% meant that a reasonable planning number for an STFC SY would be £50k.
    13  * HO: Made a number of points on the LhARA proposal including:
    14   - Route to ions other than hydrogen needs to be better articulated;
    15   - The case for ion acoustic imaging needs to include the positive case of why valuable for LhARA not just why other techniques are not appropriate;
    16   - The case that additional funds will be requested in due course needs to be better spelled out.
     10* Consideration of framework culled from agreed OBS and HO email of 18Mar22 circulated by email in advance of the meeting.
    1711
    1812----