Changes between Version 4 and Version 5 of Research/DesignStudy/Meetings/2018-10-02-CDR


Ignore:
Timestamp:
Oct 2, 2018 5:45:32 PM (6 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2018-10-02-CDR

    v4 v5  
    1919
    20201. Introduction and status of preparation of 'reference' proposal: **//KL//**
    21 1. [raw-attachment:Long-endstation.pptx Initial specification of in-vitro end-station:] **//KL, HT, SG//**
     211. [raw-attachment:Long-Endstation.pptx Initial specification of in-vitro end-station:] **//KL, HT, SG//**
    22221. Impliciations and next steps:  **//All//**
    23231. AoB
     
    2525== Notes: ==
    2626
    27 '''Present:'''
     27'''Present:''' JPa, KL, GB, SG, HT, CH, JPo
     28
     291. Introduction and status of preparation of 'reference' proposal: **//KL//**
     30 * Reference proposal still being tidied.  Will be posted as soon as possible.
     31 * This meeting to focus on end-station discussion.
     321. [raw-attachment:Long-Endstation.pptx Initial specification of in-vitro end-station:] **//KL, HT, SG//**
     33 * See slides.  Many points noted in the discussion.  In the end we agreed that **KL and GB** would collaborate to make a short document to specify the end-station so that beam simulation and end-station evaluation in MC could progress.
     34 * **CH, HT and SG** agreed to pursue endstation design/simulation.
     351. Impliciations and next steps:  **//All//**
     36 * Actions defined above.
     371. AoB
     38 * None.