= LARA CDR Meeting 8^th^ January 2019 = == Meeting details == 14:00 Room 532 Phone details: {{{ UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902 }}} Full list of telephone contacts may be found [raw-attachment:Z0-Phone-details.pdf here]. == Agenda: == 1. __Introduction: **//KL//**__ 1. __Notes on last meeting and actions arising: **//All//**__ * **AK:** Prepare strawman SciWire schedule. 1. __Progress; comparison to schedule: **//AK//**__ 1. __Parameter table update for Gabor Lens and transport: **//KL//**__ 1. __Gabor lens recommissioning update: **//CH//**__ 1. __LARA CDR skeleton: update: **//All//**__ 1. __Next steps: **//All//**__ 1. __AoB__ == Notes: == '''Present:''' JPo, CH, AK, KL, GB '''Apologies:''' JPa, OE 1. __Introduction: **//KL//**__ * The five-yeara plan for MedAustron produced by MUW/TUW/MedAustron has the SmartPhantom work scheduled in. The first exposure where we can be involved is October. Need to be ready. This places a spotlight on, e.g., the SmartPhanton preparations. * Some news from discussions before Christmas. KL made a visit to GSI and discussed with colleagues there. There are opportunities to expand our collaborative radiobiology activities. In addition, GSI is organising a meeting on new directions in radiobiology, KL submitted an abstract to this just before Christmas. * We've submitted several other abstracts: AK ot PTCOG and JPa to IPAC. We need to post these on the wiki. * Discussions with the Vice Dean indicate that we should prioritise drafting a i/p to the EPSRC call for 'Big Ideas'. KL will draft and circulate for comment. * At these meetings (i.e. LARA CDR), KL proposed an increased emphasis on the h/w and prototyping projects (Gabor lens, SciWire and SmartPhantom). This should go in parallel to the development of the CDR for LARA. 1. __Notes on last meeting and actions arising: **//All//**__ * **AK:** Prepare strawman SciWire schedule. * **Stands.** 1. __Progress; comparison to schedule: **//AK//**__ * AK requested spreadsheets from CH and KL so that he can produce the overview schedule (**action: KL, CH**). * SciWire/SmartPhantom update: * Showcase workshop will be 19Mar19 in SAF. Need to invite people from low-energy ion-beam facilities and manufacturers. All are invited to provide i/p to AK. * JPo volunteered: GSI: Peter Forck (Beam Diag) and Marco Durante. * AK will prepare schedule to end of March; focus at the moment is on the jig for winding. * CDR: * KL is late with the completion of the introduction. No one else is late (yet). * JPo/JPa had a discussion on the next steps. Parameters have been agreed. Risk mitigation possibilities for Gabor-lens failure have been considered. Could use DC or pulsed solenoids, warm or SC, or HTSC. Could be a project with Oxford Instruments. No technical reason to drive us to addopt SC/HTSC. * Gabor lens: * So far preparation conforms to the schedule. 1. __Parameter table update for Gabor Lens and transport: **//KL//**__ * Started to enter the parameters, then got pulled away. Will be done asap. 1. __Gabor lens recommissioning update: **//CH//**__ * Lens is now in the conditioning phase. Vacuum pumping began early in December and continued over Christmas. Pressure is still dropping slowly (has reached 2.9E-6mBar). * Strategy is to condition with HV/current and then add instrumentation. A second round of leak checking will be performed when in the various stages of reassembly. * Radiation protection discussions have started. X-ray emission needs to be quantified. * Wish to do a visual inspection to seek explanation for small number of breakdowns during commissioning. * Paper on previous measurements in preparation. Expect update on the document in the next weeks. 1. __LARA CDR skeleton: update: **//All//**__ * Noted above. KL needs to finish introduction and then work shoudl begin on the more meaty sections. 1. __Next steps: **//All//**__ * The preparation of a more detailed simulation of SmartPhantom is now important. Need to interface with HT. Goal is to be complete for October. 1. __AoB__ * We agreed to meet fortnightly. === Summary of actions === * **AK:** Prepare strawman SciWire schedule. * **KL, CH:** Send spreadsheet version of schedules for CDR preparation and Gabor Lens to AK.