Changes between Version 1 and Version 2 of Research/DesignStudy/Meetings/2019-06-05-LhARA


Ignore:
Timestamp:
Jun 4, 2019, 12:33:36 PM (5 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2019-06-05-LhARA

    v1 v2  
    1 = LARA CDR Meeting XX^yy^ Zzzzzz 2019 =
     1= LhARA Meeting 5^th^ June 2019 =
    22
    33== Meeting details ==
     
    1818== Agenda: ==
    1919
    20 1. __Introduction: **//KL//**__
    21 1. __Notes on last meeting and actions arising: **//All//**__
    22 1. __Progress; comparison to schedule: **//AK//**__
    23 1. __Space-charge simulation update: **//JPo et al.//**
    24 1. __Optics design update: **//JPa//**
    25 1. __Parameter table update for Gabor Lens and transport: **//KL//**__
    26 1. __Gabor lens recommissioning update: **//CH//**__
    27 1. __LARA CDR skeleton: update: **//All//**__
    28 1. __AoB__
    29 
    30 == Notes: ==
    31 
    32 '''Present:'''
    33 
    34 '''Apologies:'''
    35 
    36 1. __Introduction: **//KL//**__
    37 1. __Notes on last meeting and actions arising: **//All//**__
    38 1. __Progress; comparison to schedule: **//AK//**__
    39 1. __Space-charge simulation update: **//JPo et al.//**
    40 1. __Optics design update: **//JPa//**
    41 1. __Parameter table update for Gabor Lens and transport: **//KL//**__
    42 1. __Gabor lens recommissioning update: **//CH//**__
    43 1. __LARA CDR skeleton: update: **//All//**__
    44 1. __AoB__
    45 
    46 === Summary of actions ===
     201. [wiki:Research/DesignStudy/Proposals/2019/EPSRC-Transformative-Healthcare-Technologies-2050 EPSRC proposal] status and timeline: KL
     211. Layout and footprint: All
     221. Towards a project plan: discussion by work package:
     23 * End-to-end simulation and performance: DC / All
     24 * Laser-driven particle source: OE, ZN / All
     25 * Ion-beam capture and initial focus: JPo / All
     26 * Beam transport and delivery: JPa / All
     27 * Biological end-station: J.Parsons / All
     28 * System integration, diagnostics, dosimetry, and controls: AK / All
     29 * Co-creation of impact: RMc / All
     301. Developing the full proposal:
     31 * Text
     32 * Schedule
     33 * (Re)costing
     341. Date of next meeting
     351. AoB