Changes between Version 4 and Version 5 of Research/DesignStudy/Meetings/2019/10-08
- Timestamp:
- Oct 8, 2019, 9:54:40 AM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/Meetings/2019/10-08
v4 v5 29 29 4.2 Gabor Lens and ion capture: __J. Pozimski__ \\ 30 30 4.3 In-vitro beam line conceptual design status: __J. Pasternak, A. Kurup__ \\ 31 4.4 FFA post-accelerator design concept: __ KL for J. Pasternak__ \\31 4.4 [raw-attachment:44-0n-JPa-LhARA_FFA_08102019.pptx FFA post-accelerator design concept]: __ KL for J. Pasternak__ \\ 32 32 4.5 //In-vitro// and //in-vivo// end stations design concepts: __J. Parsons__ \\ 33 33 4.6 Outline of layout to identify infrastructure requirements: __J. Pozimski__ \\