= LhARA pre-CDR Meeting 10th Dec 2019 = == Meeting details == 14:00 Room 532, Blackett Lab. Zoom details: Join Zoom Meeting https://ukri.zoom.us/j/865262978 Phone one-tap: United Kingdom: +442034815237!,,865262978# or +442039663809!,,865262978# Join by Telephone For higher quality, dial a number based on your current location. United Kingdom: +44 203 481 5237\\ +44 203 966 3809\\ +44 131 460 1196\\ +44 203 051 2874 0800 031 5717 Meeting ID: 865 262 978 Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978 International numbers https://ukri.zoom.us/u/ap9aBI2Eh SIP: 865262978@zoomcrc.com \\ Skype for Business (Lync) https://ukri.zoom.us/skype/865262978 \\ Skype on a SurfaceHub SIP: 865262978@lync.zoom.us https://ukri.zoom.us/skype/865262978 == Agenda == * Action items from last meeting. * AK to note the instrumentation requirements for the definition of the baseline. * OE to circulate the blank risk assessment form. * AK to arrange meeting to discuss the laser target interface. * JPar to look into spot scanning beam specs for in vivo experiments. * AK to prepare abstract for upcoming abstract deadlines. * AK to ask Simon for a repository to store the simulation input files. * System updates. * Laser driven proton and ion source. * Proton and ion capture. * Stage 1 beam transport: Beam transport and delivery to the in vitro end station. * Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station. * Biological end stations. * Infrastructure and Integration. * Project plan for the delivery of LhARA. * Safety. * End-to-end simulation. * Instrumentation. * A.O.B. * Plenary meeting talks. == Notes == Participants: KL, HTL, JPas, GA, WS \\ Apologies: JPar * Previous action items * AK to note the instrumentation requirements for the definition of the baseline. * Done * OE to circulate the blank risk assessment form. * Done * AK to arrange meeting to discuss the laser target interface. * Doodle poll created. Date will be finalised soon. * JPar to look into spot scanning beam specs for in vivo experiments. * Stands. * AK to prepare abstract for upcoming abstract deadlines. * JPas circulated abstract for IPAC. Other abstracts will follow on from this. * AK to ask Simon for a repository to store the simulation input files. * Done. * System updates * beam transport - JPas * Working on definitions of the FFA. * beam transport - WS * Simulations for stage 1 and comparisons with BDSIM and GPT * transmission goes from 1% for q=1e9 to 25% for q=1e8. * Issue with beam definitions. * Infrastructure and integrations. * Ian from TD will prepare the updates of the floor plan. * AK: need to start thinking about costing. * Have order of magnitude guess. Can use existing projects to get comparison of costs. * GA: what does Instrumentation cover. * AK: Definition at the bottom of the pre-CDR preparation page [wiki:/Research/DesignStudy/PreCDR]. * Controls and monitoring included in integration but may want to include fast feedback specific monitoring in instrumentation. * GA: JT spoke to CLF and will follow up. * Simulations * Fix on using ROOT as persisted format. Provide conversions for other formats. * JPas: BDSIM simulation through to injection septum. FFA. Septum to end station in BDSIM. * KL: interface at the switching magnet? * Discussion on best location of the interface. * Interface at input to the septum and extraction after septum. * AK: Will prepare a wiki page for simulation. == Action Items == * JPar to look into spot scanning beam specs for in vivo experiments. * AK to prepare a wiki page for simulation.