= LhARA pre-CDR Meeting 21st Jan 2020 = == Meeting details == 15:00 Room 532, Blackett Lab. Zoom details: Join Zoom Meeting https://ukri.zoom.us/j/865262978 Phone one-tap: United Kingdom: +442034815237!,,865262978# or +442039663809!,,865262978# Join by Telephone For higher quality, dial a number based on your current location. United Kingdom: +44 203 481 5237\\ +44 203 966 3809\\ +44 131 460 1196\\ +44 203 051 2874 0800 031 5717 Meeting ID: 865 262 978 Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978 International numbers https://ukri.zoom.us/u/ap9aBI2Eh SIP: 865262978@zoomcrc.com \\ Skype for Business (Lync) https://ukri.zoom.us/skype/865262978 \\ Skype on a SurfaceHub SIP: 865262978@lync.zoom.us https://ukri.zoom.us/skype/865262978 == Agenda == * Action items from last meeting. * AK to add Colin's note to the wiki. * See [wiki:/Research/DesignStudy/PreCDR#Laserandcaptureinterface] * JPas to send AK beta and alpha as a function of S (calculated by BeamOptics). * System updates. * Laser driven proton and ion source. * Proton and ion capture. * Stage 1 beam transport: Beam transport and delivery to the in vitro end station. * Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station. * Biological end stations. * Infrastructure and Integration. * [raw-attachment:'Monitor Form 20_01_23.doc'​ Questions from Simeon Greenwood regarding the floor plan]. * Project plan for the delivery of LhARA. * Safety. * End-to-end simulation. * Instrumentation. * [raw-attachment:LhARA-pre-CDR.pdf Outline of the pre-CDR]. * R&D plan and schedule. * A.O.B. * Date of review. * Move time of meeting back to 14:00 from the 11th Feb == Notes == Participants: AK, WS, JPas, HTL, GA, CW, JM, KL * Action items from last week. * AK to add Colin's note to the wiki. * See Research/DesignStudy/PreCDR * JPas to send AK beta and alpha as a function of S (calculated by BeamOptics). * Stands. * Laser capture interface * KL: Should start a loop with CW and Oliver Jeremy * CW: Would like input on what is needed from the laser guys, especially since the tapered re-entrant part pokes 5cm inwards. * Beam transport * Update to Stage 1 lattice. * Working on the matching, bug in the code needs fixing. * Stage 2 vertical arc. * Can use the same arc lattice as for Stage 1. * May need to scale lengths of the quads to make sure the magnets are not superconducting. * Integration * Discussed questions from Simeon. * Specific details will be finalised after the design is frozen. * Can make the room bigger to accommodate the laser room. * Instrumentation * AK to put JM and Alex Howard in touch. * pre-CDR outline * Copy points from the R&D plan on the wiki to the relevant sections in the pre-CDR outline. * R&D plan and schedule. * AK: No updates have been received yet. * A.O.B. * Date of the review will be finalised soon. * Time of the meeting will go back to 2pm from the 11th Feb. == Action items == * JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).