Version 3 (modified by 5 years ago) ( diff ) | ,
---|
LhARA pre-CDR Meeting 11th Feb 2020
Meeting details
14:00 Room 532, Blackett Lab.
Zoom details:
Join Zoom Meeting https://ukri.zoom.us/j/865262978
Phone one-tap: United Kingdom: +442034815237,,865262978# or +442039663809,,865262978#
Join by Telephone For higher quality, dial a number based on your current location.
United Kingdom:
+44 203 481 5237
+44 203 966 3809
+44 131 460 1196
+44 203 051 2874 0800 031 5717Meeting ID: 865 262 978
Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978
International numbers https://ukri.zoom.us/u/ap9aBI2Eh
SIP: 865262978@…
Skype for Business (Lync) https://ukri.zoom.us/skype/865262978
Skype on a SurfaceHub SIP: 865262978@… https://ukri.zoom.us/skype/865262978
Agenda
- Action items from last meeting.
- JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
- System updates.
- Laser driven proton and ion source.
- Proton and ion capture.
- Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
- Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
- Biological end stations.
- Infrastructure and Integration.
- Project plan for the delivery of LhARA.
- Safety.
- End-to-end simulation.
- Instrumentation.
- Outline of the pre-CDR.
- R&D plan and schedule.
- A.O.B.
Notes
Participants: AK, HTL, WS, KL, JM, GA, SGre, CW
Apologies: JPas
- Action items
- JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
- Stands.
- JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
- System updates
- Capture
- CW: Will try to arrange meeting with Juergen.
- KL: Student will be done with lectures soon and can then start working on this.
- AK: arrange phone call with Colin, etc.
- Beam transport.
- Stage 1 simulations see plots.
- HTL: New solution for the transfer line to the in vivo end station. Can provide 1-3cm and down to 1mm.
- Infrastructure and integration
- Slides from SGre.
- Costing.
- No running costs.
- Installation and commissioning costs should be included.
- Schedule should not include running time for stage 2.
- Instrumentation.
- AK and JM met on Friday to discuss what instrumentation requirements are and what should go into the pre-CDR.
- Capture
- AOB
- Review.
- Date of the review is the 31st March.
- Additional date to be fixed for JPar and Yolanda.
- Review.
Action items
- JPas to send AK beta and alpha as a function of S (calculated by BeamOptics).
Attachments (3)
-
Stage1NewQuadsMadx.pdf
(6.2 KB
) - added by 5 years ago.
CCAP V5.1 New Quads - MADX
-
Stage1New-BDSIMSigmax.pdf
(20.0 KB
) - added by 5 years ago.
V5.1 BDSIM Stage 1 Hor. Beam Size Sigma X
-
Stage1New-BDSIMSigmay.pdf
(20.1 KB
) - added by 5 years ago.
V5.1 BDSIM Stage 1 Ver. Beam Size Sigma Y
Download all attachments as: .zip