= LhARA pre-CDR Meeting 18th Feb 2020 = == Meeting details == 14:00 Room 532, Blackett Lab. Zoom details: Join Zoom Meeting https://ukri.zoom.us/j/865262978 Phone one-tap: United Kingdom: +442034815237!,,865262978# or +442039663809!,,865262978# Join by Telephone For higher quality, dial a number based on your current location. United Kingdom: +44 203 481 5237\\ +44 203 966 3809\\ +44 131 460 1196\\ +44 203 051 2874 0800 031 5717 Meeting ID: 865 262 978 Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978 International numbers https://ukri.zoom.us/u/ap9aBI2Eh SIP: 865262978@zoomcrc.com \\ Skype for Business (Lync) https://ukri.zoom.us/skype/865262978 \\ Skype on a SurfaceHub SIP: 865262978@lync.zoom.us https://ukri.zoom.us/skype/865262978 == Agenda == * Action items from last meeting. * JPas to send AK beta and alpha as a function of S (calculated by BeamOptics). * System updates. * Laser driven proton and ion source. * Proton and ion capture. * Stage 1 beam transport: Beam transport and delivery to the in vitro end station. * Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station. * Biological end stations. * Infrastructure and Integration. * Project plan for the delivery of LhARA. * Safety. * End-to-end simulation. * Instrumentation. * R&D plan and schedule. * Writing the pre-CDR. * A.O.B. == Notes == Participants: AK, GA, JPar, HTL, WS, KL, JMat\\ Apologies: JPas * Action items * JPas to send AK beta and alpha as a function of S (calculated by BeamOptics). * Stands * System updates * Laser * AK to arrange meeting to discuss R&D plan and write up. * Capture * Meeting on Friday with Colin and KL to discuss R&D plan. * KL: Arranging meeting to coordinate the work. * Beam transport * WS: Updating Stage 1 design to get alpha to 0. * Couldn't find solution. * Lattice CCAP-v5 gives an elliptical beam in the end station. * Looked at updating previous lattices. * Using octopole after lens 5 (which now must be a solenoid) gives a more uniform distribution. * AK to arrange meeting to discuss writing up. * HTL: * JPas looked at HTL's design in BeamOptics. Beta was getting very small in places. * Looking for new solution to avoid this. Found minimum beta of about 1cm but this may still have problems with space charge. * HTL to look at simulating this using GPT. * End stations - JPar * Waiting on finalising the beam line before updating floor plan. * Discussed R&D plan. For the end stations that is automation of placing samples in the beam line. * Collaboration with Birmingham. Currently looking for space to build lab there. * Will do preliminary flash research in the next few weeks * Kristoffer Petersson, now at Oxford was Lausanne, working on FLASH. Look to collaborate. They have a flash electron machine, which would complement our protons. * Will hopefully go to Manchester on the 5th March. * Infrastructure and integration - GA * Updates to layout waiting on design being finalised. * Started writing. * Spoke to CLF. Have a paragraph on safety from them. References to existing lasers. Other issues will be solved with EPAC. * CLF mentioned shielding should be between target and laser room to allow work on the laser outside the radiation area. * Progress with costing. Should have something to circulate on Monday. * GA to circulate template spreadsheet for costing to WPMs. * Instrumentation. * R&D plan * Meetings with WPMs to update details. * Should be completed Monday next week. * Write up * Review write up in Tuesday meeting next week. == Action items == * JPas to send AK beta and alpha as a function of S (calculated by BeamOptics). * AK to arrange meeting with OE and ZN to discuss R&D plan and write up. * GA to circulate template spreadsheet for costing to WPMs. * AK to circulate detailed R&D plan and schedule.