= LhARA pre-CDR Meeting 3rd March 2020 = == Meeting details == 14:00 Room 532, Blackett Lab. Zoom details: Join Zoom Meeting https://ukri.zoom.us/j/865262978 Phone one-tap: United Kingdom: +442034815237!,,865262978# or +442039663809!,,865262978# Join by Telephone For higher quality, dial a number based on your current location. United Kingdom: +44 203 481 5237\\ +44 203 966 3809\\ +44 131 460 1196\\ +44 203 051 2874 0800 031 5717 Meeting ID: 865 262 978 Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978 International numbers https://ukri.zoom.us/u/ap9aBI2Eh SIP: 865262978@zoomcrc.com \\ Skype for Business (Lync) https://ukri.zoom.us/skype/865262978 \\ Skype on a SurfaceHub SIP: 865262978@lync.zoom.us https://ukri.zoom.us/skype/865262978 == Agenda == * Action items from last meeting. * KL to circulate terms of reference for the review. * System updates. * Laser driven proton and ion source. * Proton and ion capture. * Stage 1 beam transport: Beam transport and delivery to the in vitro end station. * Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station. * Biological end stations. * Infrastructure and Integration. * Project plan for the delivery of LhARA. * Safety. * End-to-end simulation. * Instrumentation. * R&D plan and schedule. * Version 1 [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Research/DesignStudy/PreCDR/LhARA-ProjectPlan-v1.xml xml] or [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Research/DesignStudy/PreCDR/LhARA-ProjectPlan-v1.pdf pdf] * Writing the pre-CDR. * A.O.B. == Notes == Participants: JPar, CW, AK, HTL, WS, TD,KL, JMat Apologies: JPas * Action items * Done * Laser * AK met OE * OE believes the target R&D would take 6 months. * KL: doesn't believe this is realistic. * Other areas should be included in the R&D programme such as simulation. * Capture - CW * Discussions with Bob Bingham. * 5 years R&D probably not enough. * AK: plan has 2 years to give an answer whether the lens will work or not. * CW: Probably won't be able to find solution to correct for instabilities in this time frame. * AK: Can move decision point to before the Stage 1 TDR. * CW circulated first draft of pre-CDR section. * Beam transport - WS * Meeting on Friday to discuss two options. See slides on simulation page. * Beam transport - HTL * Updated overleaf will post-accel section and transfer line. * Simulations of the end station and text to go in the pre-CDR * For the end station look at mono-energetic beam, 15 MeV +/- 2% and the 12MeV +/- 2%. * For high energy in vitro look at 127MeV look at range in a water phantom. * Details on the transfer line to go in the pre-CDR. * End stations * Just updated the draft of the pre-CDR. * Will speak with Karen on Thursday. * Pushing on with work at Birmingham on their FLASH capabilities. Beam time allocated in April for FLASH experiments. * Oxford have FLASH electrons and would be good to collaborate with them. * Visited Rutherford Cancer Centre (sites in Reading and Newport). Plan to do experiments in the next month (not FLASH). Machines not rated to do FLASH dose rates. * Instrumentation. - JM * First draft added to Overleaf. * AK and JMat to meet on Thursday. * AOB * KL: Letter to STFC sent re our plans for LhARA.