= LhARA pre-CDR Meeting 10th March 2020 = == Meeting details == 14:00 Room 532, Blackett Lab. Zoom details: Join Zoom Meeting https://ukri.zoom.us/j/865262978 Phone one-tap: United Kingdom: +442034815237!,,865262978# or +442039663809!,,865262978# Join by Telephone For higher quality, dial a number based on your current location. United Kingdom: +44 203 481 5237\\ +44 203 966 3809\\ +44 131 460 1196\\ +44 203 051 2874 0800 031 5717 Meeting ID: 865 262 978 Join from an H.323/SIP room system H.323: 162.255.37.11 (US West) 162.255.36.11 (US East) 221.122.88.195 (China) 115.114.131.7 (India) 213.19.144.110 (EMEA) 103.122.166.55 (Australia) 209.9.211.110 (Hong Kong) 64.211.144.160 (Brazil) 69.174.57.160 (Canada) 207.226.132.110 (Japan) Meeting ID: 865 262 978 International numbers https://ukri.zoom.us/u/ap9aBI2Eh SIP: 865262978@zoomcrc.com \\ Skype for Business (Lync) https://ukri.zoom.us/skype/865262978 \\ Skype on a SurfaceHub SIP: 865262978@lync.zoom.us https://ukri.zoom.us/skype/865262978 == Agenda == * Action items from last meeting. * None * System updates. * Laser driven proton and ion source. * Proton and ion capture. * Stage 1 beam transport: Beam transport and delivery to the in vitro end station. * Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station. * Biological end stations. * Infrastructure and Integration. * Project plan for the delivery of LhARA. * Safety. * End-to-end simulation. * Instrumentation. * R&D plan and schedule. * Version 2 [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Research/DesignStudy/PreCDR/LhARA-ProjectPlan-v2.xml xml] or [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Research/DesignStudy/PreCDR/LhARA-ProjectPlan-v2.pdf pdf] * [raw-attachment:2020-03-31-LhARA-pre-CDR-review-agenda-d1.pdf Pre-publication review of the pre-CDR.] * A.O.B. == Notes == * Participants: AK, HTL, KL, TD, OE, WS, JPas, CW, GA. * Status updates * laser - OE * ZN proof reading but he's on strike. * Costings being prepared. * Capture * Update in Overleaf. * Titus to add detail on diff pumping. * CW to work on the R&D part. * Beam transport - WS. * Focus has been on the write up of v4.3 as the main design and v5.3 as the alternative design. * Simulation using a more realistic beam will be done. * Ready for feedback. * AK to go over this. * JPas * Looked at tweaking 4.3 to reduced Beta from ~400 to ~50 to facilitate injection. * This change moves the focal point for collimation to where the RF cavity is. * This would increase the space needed after GL5, for octopoles, cavity and the switching dipole. * HTL * Updated Overleaf with the transfer line to in vivo. * This is more or less complete. Simulations from after RF cavity to the end station as assuming alpha=0 after extraction line. * Overleaf has many plots not included in the document. Can decide later what not to include. * Inconsistency in the BDSIM simulation being investigated. * Beta=58 coming out of extraction translates to 1cm for 15MeV, 3cm for 127MeV assuming 10x emittance growth. * AK to look at the write up on Thursday when it'll be ready. * GA * The costing has been updated based on costs from other existing facilities. * Pre-publication review of the pre-CDR - KL * Proposed agenda (see attachment) will be circulated. * 20 minutes for each speaker should cover 10 minutes for a presentation and 10 minutes for questions.