Changes between Initial Version and Version 1 of Research/DesignStudy/Meetings/2020/2020-03-24


Ignore:
Timestamp:
Mar 23, 2020, 9:43:58 PM (5 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2020/2020-03-24

    v1 v1  
     1= LhARA pre-CDR Meeting 17th March 2020 =
     2
     3== Meeting details ==
     4
     514:00 Room 532, Blackett Lab.
     6
     7== Agenda ==
     8 * Action items from last meeting.
     9  * None
     10 * System updates.
     11  * Laser driven proton and ion source.
     12  * Proton and ion capture.
     13  * Stage 1 beam transport: Beam transport and delivery to the in vitro end station.
     14  * Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station.
     15  * Biological end stations.
     16  * Infrastructure and Integration.
     17   * Floor plan updates.
     18   * Installation and Commissioning.
     19  * Project plan for the delivery of LhARA.
     20  * Safety.
     21  * End-to-end simulation.
     22  * Instrumentation.
     23 * R&D plan and schedule.
     24 * Pre-publication review of the pre-CDR.
     25   * Practice talks.
     26 * A.O.B.
     27
     28== Notes ==