Changes between Version 1 and Version 2 of Research/DesignStudy/Meetings/2020/2020-04-21


Ignore:
Timestamp:
Apr 27, 2020, 10:49:23 PM (5 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2020/2020-04-21

    v1 v2  
    3838
    3939== Notes ==
     40Participants: AK, JH, TD, WS, OE, JPas, GA, JM
     41Apologies: KL, JPar
     42
     43 * Publication
     44  * Overview
     45   * AK to move tables in post-accel into the overview.
     46  * End stations
     47   * AK read through section and made minor changes.
     48   * AK noted "in vitro" is in italics. JH to change to "in-vitro".
     49  * Infrastructure
     50   * AK to discuss costing with KL.
     51   * AK to see if there is space for the CAD image and floor plans.
     52  * Performance.
     53   * HTL: Will redo 127MeV protons and carbon dose rate simulations for the ion chamber.
     54   * AK to check numbers.
     55 * Pre-CDR
     56  * Deadline for comments is Thursday.
     57 * AOB
     58  * Capture R&D - TD
     59   * Will start plasma simulations to look at instabilities.
     60   * Look at injecting electrons into the plasma and will simulate this.
     61  * HTL:
     62   * Starting to think about more detailed simulations of Stage 1.