= LhARA Weekly Meeting 16^th^ June 2020; 14:00 BST = == Agenda == 1. [wiki:Research/DesignStudy/Meetings/2020/2020-06-09 Notes of previous meetings] and actions: * **KL**: Create draft response to referees. * **KL**: Add new participants to the relevant mailing lists. * **Done.** * **KL**: Report detailed timeline and requirements for the EPSRC Transformative Healthcare Technologies call as they are known. * **Done.** And, discussion now an agenda item. * **KL/WS**: to exchange emails with AK re "restart" of experiment and simulation meetings. * **Ongoing.** 2. Status of pre-CDR publication: **KL** * Journal has sent the paper to the referee(s). 3. Preparation of response to referees: **KL, ALL** 4. Updates: - Capture section: **CW** - Simulation: - Particle production at laser target]: **HTL** - Gabor lens simulation: **TSD** - Any other simulation 5. [wiki: CCAP plenary, 24Jun20] **KL, All** - KL needs to add new participants to the relevant mailing lists. - Proposed talks: - Overview (Kurup) - Design of the accelerator facility (Pasternak) - Simulating the accelerator facility (Shields) - Simulating the end stations (Hughes) - Possibly something on target and capture (HTL, TSD, CW, to be decided). 6. Next steps: **All** - //To include discussion of development of proposal for 3-year R&D programme// - Unanimously agreed to prepare an application to the EPSRC Transformative Healthcare Technologies call. - KL will report detailed timeline as soon as it is known. 7. AOB - JPar: 19Jun radiobiology event; all encouraged to attend. ---- == Agenda == 0. [raw-attachment:2020-06-09-Intro.pdf Introduction]: KL 1. [wiki:Research/DesignStudy/Meetings/2020/2020-06-02 Notes of previous meetings] and actions: * **KL**: Create draft response to referees. 2. Status of publication and pre-CDR: 3. Preparation of response to referees: **KL, ALL** 4. Updates: - Capture section: **CW** - Update on electrostatic simulation of Gabor lens: **TSD** - Simulation: - Particle production at laser target: **HTL** - Any other simulation 5. Plans for CCAP plenary, 24Jun20; **KL, JPa** 6. Next steps: **All** - //To include discussion of development of proposal for 3-year R&D programme// 7. AOB ----