Changes between Initial Version and Version 1 of Research/DesignStudy/Meetings/2022/2022-05-05
- Timestamp:
- May 5, 2022, 11:04:17 AM (3 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/Meetings/2022/2022-05-05
v1 v1 1 Agenda 2 3 1. Costs 4 * travel currently £26k 5 6 2. Milestones 7 * M4.1 Geant4 simulations of bema energy deposition profile M18 8 * M4.2 Acoustic sensor array design M24 9 * M4.3 Iterative reconstruction methods M42 10 * M4.4 Integration:ultra-sonic array with radiobiology station M48 11 * M4.5 LhARA ion-acoustic test results M60 12 13 3. Risk 14 15 16 4. AOB