Changes between Version 4 and Version 5 of Research/DesignStudy/Meetings/2022/2022-08-30


Ignore:
Timestamp:
Aug 30, 2022 12:29:32 PM (21 months ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2022/2022-08-30

    v4 v5  
    1515 3. The LhARA project and the proposed R&D programme for the Preliminary Activity and Preconstruction Phase — Colin Whyte (20 minutes)
    1616 4. Summary and outlook — Jason Parsons (10 minutes)
     17  = [raw-attachment:04-LhARA-Summary-and-Outlook-August-2022.pdf Draft slides]
    1718
    18194. ** Outreach: ** \\