Changes between Version 5 and Version 6 of Research/DesignStudy/Meetings/2022/2022-08-30


Ignore:
Timestamp:
Aug 30, 2022 12:29:49 PM (20 months ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2022/2022-08-30

    v5 v6  
    1515 3. The LhARA project and the proposed R&D programme for the Preliminary Activity and Preconstruction Phase — Colin Whyte (20 minutes)
    1616 4. Summary and outlook — Jason Parsons (10 minutes)
    17   = [raw-attachment:04-LhARA-Summary-and-Outlook-August-2022.pdf Draft slides]
     17  - [raw-attachment:04-LhARA-Summary-and-Outlook-August-2022.pdf Draft slides]
    1818
    19194. ** Outreach: ** \\