Changes between Version 6 and Version 7 of Research/DesignStudy/Meetings/2022/2022-08-30


Ignore:
Timestamp:
Aug 30, 2022 12:31:20 PM (20 months ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Meetings/2022/2022-08-30

    v6 v7  
    1313 2. The LhARA programme, the collaboration, its organisation, and alignment with the ITRF — Ken Long (10 minutes)
    1414  - [raw-attachment:02-2022-08-30-LONG.pptx Draft slides]
    15  3. The LhARA project and the proposed R&D programme for the Preliminary Activity and Preconstruction Phase — Colin Whyte (20 minutes)
     15 3. The LhARA project and the proposed R&D programme for the Preliminary Activity and Preconstruction Phase — Colin Whyte (25 minutes)
     16  - [raw-attachment:03-LhARA22-08-30-CW.pdf Draft slides]
    1617 4. Summary and outlook — Jason Parsons (10 minutes)
    1718  - [raw-attachment:04-LhARA-Summary-and-Outlook-August-2022.pdf Draft slides]