Changes between Version 4 and Version 5 of Research/DesignStudy/Meetings/2022/2022-10-25
- Timestamp:
- Oct 25, 2022, 12:54:39 PM (2 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/Meetings/2022/2022-10-25
v4 v5 12 12 13 13 4. **Dry run of presentations for 27Oct22 accelerator review**: 14 - Project Management (WP1):14 - __Project Management (WP1):__ 15 15 1. //Overview// – Colin Whyte (Strathclyde); Neil Bliss (STFC TD/DL) 16 16 - [raw-attachment:LhARA22-10-27-CW.pdf Slides] 17 - Laser-driven proton and ion source (WP2):17 - __Laser-driven proton and ion source (WP2):__ 18 18 1. //Overview and management// – Elisabetta Boella (Lancaster/CI) \\ 19 19 2. //Risk management// – Nicholas Dover (Imperial/JAI) \\ 20 20 3. //Diagnostics, instrumentation and targetry// – Ross Gray (Strathclyde/CI) 21 - Proton and ion capture (WP3):21 - __Proton and ion capture (WP3):__ 22 22 1. //Gabor lens// – Christopher Baker (Swansea) 23 - Transfer lines and post accelerator (WP6):23 - __Transfer lines and post accelerator (WP6):__ 24 24 1. //Stage 1 and Stage 2 vision// – Jaroslaw Pasternak (Imperial/JAI/ISIS) \\ 25 25 2. //General facility infrastructure and integration (WP6)// – Neil Bliss (STFC TD Daresbury)