Changes between Version 3 and Version 4 of Research/DesignStudy/PreCDR/SG/2019-11-28


Ignore:
Timestamp:
Nov 20, 2019, 11:22:15 PM (5 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/PreCDR/SG/2019-11-28

    v3 v4  
    2121  * Outline of structure of pre-CDR document.
    2222
     233. Discussion of pre-publication review of LhARA pre-CDR: All \\
     24 //To include: //
     25  * Discussion of possible reviewers.  To guide preparation, the review panel should be small and include a radiobiologist, an accelerator scientist, and a detector/instrumentation scientist.
     26
    23273. First discussion of structure of R&D plan: All \\
    2428