| 76 | * Infrastructure |
| 77 | * Access to basement for installation, etc. |
| 78 | * Instrumentation |
| 79 | * Beam diagnostics. |
| 80 | |
| 81 | == R&D Plan == |
| 82 | * Laser |
| 83 | * No major R&D needed since it will be a commercial system. |
| 84 | * Proton and ion capture. |
| 85 | * Gabor lens performance verification. |
| 86 | * Stage 1 beam transport. |
| 87 | * No major R&D needed. |
| 88 | * Stage 2 beam transport. |
| 89 | * FFA: Magnet design and prototyping. |
| 90 | * FFA: RF cavity. |
| 91 | * Instrumentation. |
| 92 | * Dose calibration for high-intensity beams. |
| 93 | * Online dose monitor. |
| 94 | * Online beam monitor for low energy beam. |