Changes between Version 22 and Version 23 of Research/DesignStudy/PreCDR


Ignore:
Timestamp:
Nov 28, 2019, 10:00:03 AM (5 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/PreCDR

    v22 v23  
    8282== R&D Plan ==
    8383  * Laser
    84     * No major R&D needed since it will be a commercial system.
     84    * No major R&D needed for the laser since it will be a commercial system.
     85    * Target particle production.
    8586  * Proton and ion capture.
    86     * Gabor lens performance verification.
     87    * Gabor lens prototype development and performance verification.
    8788  * Stage 1 beam transport.
    8889    * No major R&D needed.
    8990  * Stage 2 beam transport.
    9091    * FFA: Magnet design and prototyping.
    91     * FFA: RF cavity.
     92    * FFA: RF cavity performance verification.
     93  * End station
     94    * Automation.
    9295  * Instrumentation.
    9396    * Dose calibration for high-intensity beams.