Changes between Version 33 and Version 34 of Research/DesignStudy/PreCDR


Ignore:
Timestamp:
Dec 17, 2019, 9:49:41 AM (5 years ago)
Author:
kurup
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/PreCDR

    v33 v34  
    6161    * Transfer line to the FFA injection system.
    6262    * Abort line at 15MeV (most likely to be just after the Stage 1 vertical arc for fail-safe operation).
    63     * Stage 2 extraction line and transfer line to the in vivo end station.
     63    * Stage 2 extraction line and transfer line (including rebunching and sweeper magnets for spot-scanning) to the in vivo end station.
    6464    * Stage 2 vertical bend to the second in vitro end station.
    6565    * Abort line at 127 MeV.