Changes between Version 36 and Version 37 of Research/DesignStudy/PreCDR
- Timestamp:
- Jan 14, 2020, 1:45:49 PM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/DesignStudy/PreCDR
v36 v37 69 69 * Power supplies (and klystrons?) for RF cavities. 70 70 * End station 71 * [raw-attachment:'In vitro end station floor plan draft.docx' First draft of in vitro end station floor plan.]71 * [raw-attachment:'In vitro end station floor plan v2.docx' Version 2 of the in vitro end station floor plan]. This includes the beam housing for in vitro experiments in Stage 2. 72 72 * Can be re-configured to allow two end stations in Stage 2. 73 73 * Current space for in vivo end station is sufficient.