= Preparation of pre-CDR for LhARA = {{{ #!html
Last updated: 11Nov19 [KL]
}}} An effort to develop a 'pre-CDR' has been initiated supported by the award of an STFC Opportunities 2019 award. This page is being used to collect and share information in the preparation of the pre-CDR. == Key dates == * **29 Nov 2019**: First issue of the baseline. This will include the floor layout, WBS, Interfaces document and the parameter table. * **31 Dec 2019**: First end-to-end tracking simulation. * **31 Jan 2020**: - Design of the facility will be frozen. - First view of the costs. - R&D programme needed to realise LhARA and be able to write a technical design report will be defined. * **28 Feb 2020**: Complete the write-up of the pre-CDR. * **Mar 2020**: External review of pre-CDR in advance of publication. == Project management information == * [raw-attachment:2019-11-05-WBS.pdf Work breakdown structure] * [raw-attachment:2019-11-05-Interfaces.pdf Definition of the system interfaces] === Work package managers === ||** Work package **|| ** Manager(s) **||** Email **|| || Laser driven proton and ion source || Zulfikhar Najmudin \\ Oliver Ettlinger || z.najmudin@imperial.ac.uk \\ o.ettlinger13@imperial.ac.uk || Proton and ion capture || Stage 1 beam transport: Beam transport and delivery to the in vitro end station || Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station || Biological end stations || Infrastructure and Integration || Project plan for the delivery of LhARA || Safety || End-to-end simulation || Instrumentation