Preparation of pre-CDR for LhARA
Last updated: 11Nov19 [KL]
An effort to develop a 'pre-CDR' has been initiated supported by the award of an STFC Opportunities 2019 award. This page is being used to collect and share information in the preparation of the pre-CDR.
Key dates
- 29 Nov 2019: First issue of the baseline. This will include the floor layout, WBS, Interfaces document and the parameter table.
- 31 Dec 2019: First end-to-end tracking simulation.
- 31 Jan 2020:
- Design of the facility will be frozen.
- First view of the costs.
- R&D programme needed to realise LhARA and be able to write a technical design report will be defined.
- 28 Feb 2020: Complete the write-up of the pre-CDR.
- Mar 2020: External review of pre-CDR in advance of publication.
Project management information
Work package managers
The following table lists the work packages, managers and contact details. NB: you need to be logged in to see the full email link.
Work package Manager(s) Laser driven proton and ion source Zulfikhar Najmudin
Oliver Ettlingerz.najmudin@…
o.ettlinger13@…Proton and ion capture Juergen Pozimski
Colin Whytej.pozimski@…
colin.whyte@…Stage 1 beam transport: Beam transport and delivery to the in vitro end station Jaroslaw Pasternak
William Shieldsj.pasternak@…
William.Shields.2010@…Stage 2 beam transport: Post-acceleration and beam delivery to the in vivo end station Jaroslaw Pasternak j.pasternak@… Biological end stations Jason Parsons
Jonathan HughesJ.Parsons@…
Jonathan.Hughes@…Infrastructure and Integration John Thomason
Galen Aymarjohn.thomason@…
galen.aymar@…Project plan for the delivery of LhARA Ajit Kurup a.kurup@… Safety John Thomason
Galen Aymarjohn.thomason@…
galen.aymar@…End-to-end simulation Ajit Kurup a.kurup@… Instrumentation TBD
Attachments (18)
-
2019-11-05-WBS.pdf
(125.9 KB
) - added by 5 years ago.
Work breakdown structure
-
2019-11-05-Interfaces.pdf
(275.5 KB
) - added by 5 years ago.
Definition of the system interfaces
- 2019-11-15-Interfaces.pdf (276.1 KB ) - added by 5 years ago.
- FloorPlan-v0.png (221.9 KB ) - added by 5 years ago.
- In vitro end station floor plan draft.docx (168.9 KB ) - added by 5 years ago.
- LhARA_parameter_list-v3.pdf (68.7 KB ) - added by 5 years ago.
- In vitro end station floor plan v2.docx (238.7 KB ) - added by 5 years ago.
- Gabor_Laser_cartoon_20_01_15.pdf (413.2 KB ) - added by 5 years ago.
- Pressure drop2 20_01_09.docx (728.4 KB ) - added by 5 years ago.
- LhARA-ProjectPlan-v1.xml (8.6 MB ) - added by 5 years ago.
- LhARA-ProjectPlan-v1.pdf (381.3 KB ) - added by 5 years ago.
- LhARA-ProjectPlan-v2.pdf (385.7 KB ) - added by 5 years ago.
- LhARA-ProjectPlan-v2.xml (11.5 MB ) - added by 5 years ago.
- 2020-04-01-NominalBeamStage2.pdf (131.9 KB ) - added by 5 years ago.
- 2020-04-02-LhARA-preCDR-frontiers-d0.0.pdf (133.7 KB ) - added by 5 years ago.
- 2020-04-17-LhARA_pre_CDR-d3.0.pdf (10.6 MB ) - added by 5 years ago.
- 2020-05-21-Frontiers_LhARA_preCDR-d3.1.pdf (2.2 MB ) - added by 5 years ago.
- 2020-08-14-Frontiers_LhARA_preCDR-d4.0.pdf (1.9 MB ) - added by 4 years ago.