Changes between Version 4 and Version 5 of Research/DesignStudy/Reviews/AugSep22/Review/03Sep22


Ignore:
Timestamp:
Sep 23, 2022, 7:12:12 AM (2 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/Reviews/AugSep22/Review/03Sep22

    v4 v5  
    11111. __Rbio and non-accelerator programme:__ \\
    1212 The review panel proposes that the first section of the review (29Sep) focus on the articulation of “3 key topics in radiation biology” that LhARA will address as soon as it comes on line.  A. Giacca and J. Parsons will initiate a discussion to identify the three topics and to flesh them out a little for the 29Sep.  We shall need to point out that our vision for the 3-key topics will necessarily evolve as the status of the science progresses. 
    13  
    14  P. Bolton urged us to consider the development of a plan for the “LhARA biological science programme” as well structured as we have now developed for the LhARA Project.  J. Parsons will prepare a discussion of how to address this interesting provocation which gives us the opportunity to bring together some so-far unstructured aspects of our programme.
     13
     14 P Bolton urged us to consider the development of a plan for the “LhARA biological science programme” as well structured as we have now developed for the LhARA Project.  J. Parsons will prepare a discussion of how to address this interesting provocation which gives us the opportunity to bring together some so-far unstructured aspects of our programme.
    1515 
    1616 The possible timing of the sister review was discussed and a target of Feb/Mar23 was agreed.  This puts a timeframe on the first round of user consultation lead by WP5.  A first fleshed out plan for how to bring the consultation to a conclusion by the 29/30Sep will need to be prepared for the 29/30Sep meetings.