Version 8 (modified by 4 years ago) ( diff ) | ,
---|
LhARA Steering Group meeting #5
11th December 2020 16:00 GMT
Notes
- Notes of last meeting and actions arising:
- KL/CB: Consider meeting between Imperial (and other) ion-accelerator experts with the relevant experts in CLF.
- Superceded: Strong engagement of CLF through C. Brenner. Building on this going forward.
- KL/KK: to collaborate on the development for a proposal for multidisciplinary a meeting on the timescale of November 2020.
- On going: Concept has evolved into a peer group meeting on 24Jun21 in conjunction with a public Rutherford Lecture. A small organising committee is being formed and KK has (is about to) receive the invitation.
- KL: Ensure one representative per group at the next LhARA SG meeting.
- Done.
- KK, JPar, CW, KL: Make relevant contact with local PPI groups as described in item 4 (multidisciplinary meeting).
- Superceded.
- KL: Write to J.Clarke to ask for support to reach out to relevant industry.
- Stands.
- PA: Make contact with MTC to see how to make contact with relevant industry.
- PA/KL will cooperate in drafting a letter.
- KL: Review proposed w/p structure and skills matrix taking into account comments under item 4.
- Done.
- KL/CB: Consider meeting between Imperial (and other) ion-accelerator experts with the relevant experts in CLF.
- Update on progress: KL
To include proposal for P. Beard (UCL) to join the LhARA collaboration.
- Raising the resources to execute the LhARA programme: All
Our outline proposal to the EPSRC THT has not been successful. Therefore, the SG should consider resource-raising targets for the next 2 years.
Outline discussion by workpackage:- Outline Conceptual Design Report for the PoP biological-assessment facility -- R. McLauchlan, T. Price; All
- Proton- and ion-acoustic imaging -- J. Bamber, P. Beard; All
- Evaluation of the benefits of the initiative & optimisation of the R&D programme -- S. Green, P. Price; All
- Development of next steps in LhARA accelerator R&D programme -- C. Whyte, J. Pasternak; All
Update on industrial strategy S. Towe (KL); All
- DONMs
- AoB
Attachments (2)
- 2020-12-11-Update-Long.pptx (7.2 MB ) - added by 4 years ago.
- CWhyte-LhARA_SG.pdf (2.7 MB ) - added by 4 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.