Changes between Version 1 and Version 2 of Research/DesignStudy/WPMGroup/Meetings/2022/05-05


Ignore:
Timestamp:
May 5, 2022, 11:16:10 AM (3 years ago)
Author:
cwhyte1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/WPMGroup/Meetings/2022/05-05

    v1 v2  
    11Agenda
     2
     31 Cost
     4* Travel £26k
     5
     62. Milestones
     7* M4.1 Geant4 simulations of bema energy deposition profile     M18
     8* M4.2 Acoustic sensor array design             M24
     9* M4.3 Iterative reconstruction methods         M42
     10* M4.4 Integration:ultra-sonic array with radiobiology station M48
     11* M4.5 LhARA ion-acoustic test results      M60
     12
     133. Risk
     14
     154. AOB