Changes between Initial Version and Version 1 of Research/DesignStudy/WPMGroup/Meetings/2022/05-05WP2


Ignore:
Timestamp:
May 5, 2022 11:21:34 AM (2 years ago)
Author:
cwhyte1
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/DesignStudy/WPMGroup/Meetings/2022/05-05WP2

    v1 v1  
     1Agenda
     2
     31 Cost
     4* Travel £30k
     5
     62. Milestones
     7* M1: Prediction of optimised proton source parameters for 100+ TW laser systems based on hydrodynamic and kinetic simulations”       M12
     8* M2: First SCAPA ion source simulations and experiment completed.    M18
     9* M3: Report detailing optimisation of proton and ion generation on SCAPA, leading to LhARA laser specification M30
     10* M4: Demonstration of 10 Hz operation of advanced targetry platform at ICL M48
     11* M5: Demonstration of stabilised 5 Hz beam generation on SCAPA M60
     12
     133. Risk
     14
     154. AOB