Version 2 (modified by 5 years ago) ( diff ) | ,
---|
Gabor Lens meeting: 24Apr20; 16:00 BST
This meeting will be unstructured once more. Last time we agreed the following actions:
- KL: Work with RAL to re-vitalise TSD's federal Id;
- Ongoing.
- RB: Dust off calculation of instabilities in the electron plasma
- Done. Initial indication of instability circulated.
- TSD: Attempt some tutorial examples from VSIM
- Stalled: Awaits resurrection of federal Id.
- JPo: Provide TSD with the geometry of the present prototype Gabor lens
- Stands.
- KL/RB: Take a look at the Bingham et al paper on laser-driven accelerator for medicine
- Stands.
Discussion of next steps.
Connection details
Join Zoom Meeting: https://cern.zoom.us/j/98574047581?pwd=Zkx5Y2c3Tkp6dVh6U0wydVUxUHJ3dz09
Attachments (1)
- Lens-dimensions.pdf (47.3 KB ) - added by 5 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.