Version 7 (modified by 4 years ago) ( diff ) | ,
---|
Gabor Lens meeting: 04Jun20; 16:30 BST
Present:
Notes
Summary of actions:
Agenda
- Introduction, notes and actions: KL/All
- KL/RB: Take a look at the Bingham et al paper on laser-driven accelerator for medicine
- JPo: Provide TSD with the geometry of the present prototype Gabor lens
- Updates on the calculation of instability: RB
- Updates on the particle generation: HT
- Updates on VSim simulations: TSD
- Discussion of next steps: All
- ERC proposal: 0th draft of skeleton for "B2": KL
Connection details
Join Zoom Meeting: https://cern.zoom.us/j/95180466797?pwd=WGMyT1BOM3diOUk4U2hXVkpqSmtVQT09
Attachments (5)
- 2020-06-04-B2.pdf (152.5 KB ) - added by 4 years ago.
- Diocotron-instability.docx (61.8 KB ) - added by 4 years ago.
- 040620_HTL.pdf (240.7 KB ) - added by 4 years ago.
- LhARA_Capture_04Jun20_TSD.pdf (361.8 KB ) - added by 4 years ago.
- 2020-06-04-ERC-ADV-status.pdf (50.6 KB ) - added by 4 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.