Version 7 (modified by 4 years ago) ( diff ) | ,
---|
Gabor Lens meeting: 30Jul20; 16:00 BST
Summary of actions
- CW: Make contact with Martin King
- TN: Draw an image of the Gabor lens for the paper.
- KL: Contact TN to ask for vacuum cleaning procedure for old Gabor lens.
Notes
- Introduction, notes and actions: KL/All
- RB: make contact with Martin King
- Stands. CW will take over the charge to make contact. this one over.
- TN: draw an image of the Gabor lens for the paper
- Ongoing. KL reported for TN that TN is making a sketch based on the drawings in the file-pack received from P.Savage. This will be used as is or redrawn by a professional.
- RB: make contact with Martin King
- Progress on beam experiments paper: TN
- KL and TN made a call earlier and discussed updates to the paper. The update of the first three sections of the paper was agreed. KL suggested TSD took part in the update as the background will be useful to him going forward. TSD OK with this.
- Updates on the particle generation: HT
- See slides.
Clear progress on understanding the evolution of the particle distributons. There is a need to compare distributions to other simulations, published analyses, and/or measurements. HT: is in contact with OE over details of the simulations.
Means to address the practical issue of injecting particles into the beam line were discussed. HTL will look for a means of selecting particles likely to be transported at least as far as the first Gabor lens. A thread to follow the particle distributions would then be started. The particles not selected for transport down the beam line would then be analysed to see how they evolve and whether they have the potential to enter the Gabor lens.
- See slides.
- Updates on VSim simulations: TSD
- See slides.
- Discharge simulation attempted with water. No discharge observed assuming water vapor at 10{-6}mBar. Feeling was that the simulation of breakdown was quite a challenge. And that there would likely be more profit in trying to simulate the old lens with the methods developed for the new lens.
- In the discussion of the discharge-simulation we noted that the best vacuum was obtained once the plasma had been burning for a while. We agreed we needed to ask TN what the procedure was to produce the discharge in the lens and, ideally, to have the record of pressure versus time. (KL)
- ERC proposal: KL/All
Updated "B1"
All invited to comment. Updated "B2"
- AOB: All
None.
Agenda
- Introduction, notes and actions: KL/All
- RB: make contact with Martin King
- TN: draw an image of the Gabor lens for the paper
- Progress on beam experiments paper: TN
- Updates on VSim simulations: TSD
- ERC proposal: KL/All
Updated "B1"
Updated "B2"
- AOB: All
Attachments (3)
- HTL_meeting_300720.pdf (454.9 KB ) - added by 4 years ago.
- 2020-07-28-B1-Long-d1.docx (54.0 KB ) - added by 4 years ago.
- LhARA_Capture_30Jul20_TSD.ppsx (10.5 MB ) - added by 4 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.