= LhARA Capture meeting: 10MAR22; 16:00 BST = **Present:** CB(Chair), KL, BB, TD, EB, CW, MC. **Apologies:** AK == Notes == *EB: supervising student working on PIC simulations of co-propagating electrons - update in due course *CB: ITRF 'hard' costs still unknown, but expected soon. Proposal to be updated soon afterward to meet set deadlines. *As TD gave simulation update at recent fortnightly meeting, and detailed update of Capture WP expected at collaboration meeting, options discussed for 19Apr22 scientific contribution *EB source simulation update potentially on 5Apr22 [[BR]] *As still no license for VSim available, no simulation update from TD *TD abstract and oral presentation at IOP HEPP conference accepted [[BR]] *Current Swansea solenoid issues discussed *Consensus to accept as-is (i.e is 10% low, in accordance with TD simulations, models, and CB measurements) *Further testing possible, but not worth much effort [[BR]] *MC updates design paper contribution is progressing well *Doodle poll live for new 1/2-day discussion [[BR]] *HT completion discussed === Summary of actions: === *KL to chase ND for slides - Done *Doodle poll for 1/2-day to be completed - **All** *Consider capture proposal update presentation on 19Apr22 - CB *Send contributions to CB when ready - TD ---- == Agenda == 1. //Introduction, notes and actions//: Chair/All 2. //Update on the results of simulations//: **TD** 3. //Update on Experimental components//: **CB** 4. //Update on Progress Paper//: **MC** 5. //AOB//: **All** == Connection details == Join Zoom Meeting: **https://cern.zoom.us/j/68763369382?pwd=V05jYjM0MHNTeHFwQjdYbG1hSDhPdz09 ** ----