= Gabor Lens meeting: 3NOV2022; 16:00 BST = **Present:** CB (chair), SE, MC, CW, TD, BB, KL, JP [[BR]] **Apologies:** RH, EB [[BR]] == Notes == 1a. Previous actions:[[BR]] 1. Swansea press release resulted in local "That's TV" interview by RH [[BR]] 2. DPP went OK for LhARA. Limited engagement but new literature research avenue suggested. [[BR]] 3. IAB review seemed to go well for WP3 from CB perspective as presenter. Two immeadiate suggestions: 1. continue researching beyond prototype; 2. Engage with other users. Hopefully IAB will provide feedback in mid-October. [[BR]] 2a. ITRF now 1/24th complete. Reporting to WP1 due tomorrow. Discussion on spend details - linear of exisiting staff with discontinuity with new staff, equipment spend, etc. [[BR]] 2b. Full reporting of effort to be considered as to not under represent effort. Perhaps 3 or 6 monthly, but this effort needs to be considered. [[BR]] 2c. Discussed in AOB: clear lines of reporting need to be established, currently 'wiki project group' is suggested, details to be discussed in next WPM meeting to not duplicate effort. [[BR]] 2d. No current update on award letter timescale. [[BR]] 3a. No update. [[BR]] 4a. See 2c. [[BR]] 4b. Discussion on Gabor lens 1 loading technique & apparatus design. Seperate meeting required. [[BR]] 4c. Capture mailing list issues noted. [[BR]] 4d. In person meeting in Swansea proposed. [[BR]] **DoNM:** 10NOV22[[BR]] === Summary of actions: === 1. **CB** Arrange virtual design meeting. [[BR]] 2. **CB** Arrange in-person ITRF Capture meeting. [[BR]] 3. **CB** Report October 2022 progress to WP1. [[BR]] 4. **KL** Look into mailing list issues. [[BR]] ---- == Agenda == 1. //Introduction, notes and actions//: **Chair/All** 2. //ITRF update//: **CB** 3. //Research update//:**All** 4. //AOB//: **All** == Connection details == Join Zoom Meeting: **https://cern.zoom.us/j/68763369382?pwd=V05jYjM0MHNTeHFwQjdYbG1hSDhPdz09** ----