Changes between Version 2 and Version 3 of Research/Instrumentation/IonAcoustic/Meetings/2021/09/29


Ignore:
Timestamp:
Sep 28, 2021, 5:49:43 PM (3 years ago)
Author:
longkr
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Research/Instrumentation/IonAcoustic/Meetings/2021/09/29

    v2 v3  
    66
    771. //Introduction, [wiki:Research/Instrumentation/IonAcoustic/Meetings/2021/09/15 notes and actions of previous meeting]//: **KL/All**
    8  - None recorded.
     8 * **KL** – circulate long version of GC proposal
     9  * **Done.**
     10 * **JG** – circulate literature on existing lab ion acoustic imaging setups
     11  *
     12 * **KL, BC** meet to discuss putting the parts of the simulation together to get the acoustic pressure for the low energy beam
     13  * **Done.**
     14 * **JM, KL** meet at RAL to discuss taking forward the SmartPhantom. JM talk to Liam Cooper, Fergus Wilson.
     15  * **Done.**
     16 * **JB** to connect KL with Emma Harris and prepare some slides for next week if possible
     17  * **Done.**
    918
    10 2. //Update on simulation of beam//: **AMLR, KK, JMcG**
     192. //Time to traverse Bragg peak and characteristic frequency//: **KL**
    1120
    12213. //Proposal planning //: **JB, JM, All**