Changes between Version 1 and Version 2 of Research/Instrumentation/Meetings/2019/06-26
- Timestamp:
- Jun 26, 2019, 10:30:58 AM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/Instrumentation/Meetings/2019/06-26
v1 v2 1 = SmartPhantom meeting: Wednesday 26^th^ June 2019, 09:00 BST =1 = SmartPhantom meeting: Wednesday 26^th^ June 2019, 13:30 BST = 2 2 3 3 == Meeting details == … … 20 20 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/06-11 last meeting]: 21 21 * **AK:** Establish minimum bending radius. 22 * **Done.** Saint Gobain say "30--40 times the fibre diameter", so for us this would lead to the minimum bending radius being 7.5mm -- 10mm. This seems 'tight' to me. We should decide specification that we shall adopt. 22 23 * **AK:** Place an order for clear fibre. 24 * **Ongoing.** 23 25 * **LC:** Produce drawings for quote. 26 * **Done.** Poster in the [wiki:Research/Instrumentation/Documentation/Drawings drawing repository]. 24 27 * **HT:** Simulate doublet layers potted in Araldite. 25 * **HT:** Try and estimate light yield from simulation. 28 * **Underway**: Geometry updated so that fibres are embedded in Araldite. Assumptions made re chemical composition of Araldite. 29 * **HT:** Try and estimate light yield from simulation. 26 30 * **HT:** Find MedAustron rep rate. 31 * **Done.** See [raw-attachment:MedAustron-rates.txt note on time structure of beams at MedAustron]. 27 32 * **HT:** Inject 90Sr electrons to estimate test-rig light yeild. 28 33 29 34 2. Design update: LC \\ 35 * [raw-attachment:190626-SmartPhantom.pdf Slides]. 30 36 31 37 3. Options for manufacture: LC, KL & discussion \\