    46466. Schedule: HTL and discussion (all) \\
    47  * Discussion of [raw-attachment: schedule] led to conclusion that there is a need to advance the construction etc. as far as possible.
     47 * Discussion of [raw-attachment:smartphantom.png schedule] led to conclusion that there is a need to advance the construction etc. as far as possible.
    4848 * Agreed to wind first prototype planes with scifi (not fishing line).  Hope that these will be acceptable detectors for use.
    4949 * We **agreed** to meet next Tuesday (time to be defined) to make a first baseline version of the schedule **KL** to suggest time.
     
    6262 * **KL**: Liaise to develop concept for polishing.
    6363 * **KL** send MuScat paper for reference.
    64  * **KL**: Seek meeting with S.Gruber to get her input into the design.
     64 * **KL**: Seek meeting with S.Gruber and/or M.Puchalska to get her input into the design.
    6565 * **LC**: Check re technical effort at RAL for assembly/dowling etc.
    6666 * **LC/JB:** Finalise specification of interface between clear-fibre connector and optical assembly.