Changes between Version 11 and Version 12 of Research/Instrumentation/Meetings/2019/07-24
- Timestamp:
- Jul 24, 2019, 5:43:55 PM (5 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Research/Instrumentation/Meetings/2019/07-24
v11 v12 45 45 46 46 6. Schedule: HTL and discussion (all) \\ 47 * Discussion of [raw-attachment: schedule] led to conclusion that there is a need to advance the construction etc. as far as possible.47 * Discussion of [raw-attachment:smartphantom.png schedule] led to conclusion that there is a need to advance the construction etc. as far as possible. 48 48 * Agreed to wind first prototype planes with scifi (not fishing line). Hope that these will be acceptable detectors for use. 49 49 * We **agreed** to meet next Tuesday (time to be defined) to make a first baseline version of the schedule **KL** to suggest time. … … 62 62 * **KL**: Liaise to develop concept for polishing. 63 63 * **KL** send MuScat paper for reference. 64 * **KL**: Seek meeting with S.Gruber to get her input into the design.64 * **KL**: Seek meeting with S.Gruber and/or M.Puchalska to get her input into the design. 65 65 * **LC**: Check re technical effort at RAL for assembly/dowling etc. 66 66 * **LC/JB:** Finalise specification of interface between clear-fibre connector and optical assembly.