Version 9 (modified by 5 years ago) ( diff ) | ,
---|
SmartPhantom meeting: Wednesday 24th July 2019, 11:00 BST
Notes:
Present: KL, LC, JB, AK, HTL
- Notes and actions from last meeting:
- HTL: Inject 90Sr electrons to estimate test-rig light yeild.
- Done. Simulation estimating number of photo-electrons created (see slides). Now await measurement to allow comparison.
- Agree: Make measurement of activity of source using silicon detector. This was done; the rate measured was 90kHz.
- KL: Liaise to develop concept for polishing.
- Ongoing. Possibly use diamond cutter after having glued two planes together to form station.
- KL: Work within Imperial to find assembly space.
- Done.
- KL: Seek meeting with S.Gruber to get her input into the design.
- Ongoing.
- LC: Obtain chemical composition of resin and black dye.
- Done.* Carbon-black pigment. Its composition is "like" resin. KL send MuScat paper for reference.
- LC: Develop concept for optical connector at camera end of lightguide and for potting of light guide at detector end.
- Done. Example part has been printed. We discussed the dimensions and agreed to make it one piece.
- KL: Liaise with FW to work out how to place aluminium-part order.
- Done. Order may be placed on the code used for other components.
- JB: Purchase parts for optical readout system.
- Done. All parts for prototype are ordered. Optical system concept developed and initial sketch uploaded.
- AK: Provide JB with project code for purchase of optical readout components.
- Done.
- HTL: Inject 90Sr electrons to estimate test-rig light yeild.
- Mechanical design update: LC
- See slides. Excellent discussion, next steps noted in LC's slides. Imperial my make sheet-metal stand.
- We agreed to assemble jig at RAL because of need to measure accuracy of assembly. Implies some technical effort from RAL. LC will see if this is available.
- Optical readout update: JB
- We discussed the concept that had been circulated. JB demonstrated the concept with parts (holder, lens assembly, locking ring).
- Concept seemed good. Light tighting felt to be straightforward.
- LC/JB: Agreed to finalise specification of interface between clear-fibre connector and optical assembly.
- Control system and SciWire readout update: AK
- Will use LabView. AK has requested LabView license for himself and HTL. Work will be divided between AK and HT.
- Need to purchase laptops to run/develop system: one for development one for development and operation of system.
- Stepper motor with travel of 150mm will be purchased from ThorLabs. Order will include two locking rings for optical system.
- JB will send part number to AK.
- Simulation update: HTL
- Points noted above.
- Schedule: HTL and discussion (all)
- Discussion of schedule led to conclusion that there is a need to advance the construction etc. as far as possible.
- Agreed to wind first prototype planes with scifi (not fishing line). Hope that these will be acceptable detectors for use.
- We agreed to meet next Tuesday (time to be defined) to make a first baseline version of the schedule KL to suggest time.
- Next steps
- Preparation of components indicates that assembly of winding jig could start after 12Aug19. Need to watch this space.
- DONM
- 07Aug19
- AoB
- None.
Summary of actions
- KL: Liaise to develop concept for polishing.
- KL: Seek meeting with S.Gruber to get her input into the design.
- LC: Check re technical effort at RAL for assembly/dowling etc.
- LC/JB: Finalise specification of interface between clear-fibre connector and optical assembly.
- JB Provide ThorLabs part numbers of remaining optical components to AK.
- KL: Suggest time for schedule discussion on 30Aug19.
Meeting details
Blackett 521 (The Tutorial Room) and teleconference
Phone details:
UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902
Full list of telephone contacts may be found here.
Agenda:
- Notes and actions from last meeting:
- HTL: Inject 90Sr electrons to estimate test-rig light yeild. Image
* - KL: Liaise to develop concept for polishing.
* - KL: Work within Imperial to find assembly space.
- Done.
- KL: Seek meeting with S.Gruber to get her input into the design.
- Ongoing.
- LC: Obtain chemical composition of resin and black dye.
* - LC: Develop concept for optical connector at camera end of lightguide and for potting of light guide at detector end.
* - KL: Liaise with FW to work out how to place aluminium-part order.
- Done. Order may be placed on the same code.
- JB: Purchase parts for optical readout system. *
- AK: Provide JB with project code for purchase of optical readout components.
*
- HTL: Inject 90Sr electrons to estimate test-rig light yeild. Image
- Mechanical design update: LC
- Optical readout update: JB
- Control system and SciWire readout update: AK
- Simulation update: HTL
- Schedule: HTL and discussion (all) Gantt Chart
- Next steps
- DONM
- 07Aug19
- AoB
Attachments (4)
-
smartphantom.png
(49.6 KB
) - added by 5 years ago.
Schedule
-
Sr90_ly.png
(103.0 KB
) - added by 5 years ago.
Sr90_TestRig_Lightyield
- projection_assembly.pdf (24.7 KB ) - added by 5 years ago.
- 240719-SmartPhantomDesign.ppt (777.5 KB ) - added by 5 years ago.
Download all attachments as: .zip
Note:
See TracWiki
for help on using the wiki.