= SmartPhantom meeting: Wednesday 21^st^ August 2019, 11:00 BST = == Meeting details == Blackett 521 (The Tutorial Room) and teleconference Phone details: {{{ UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902 }}} Full list of telephone contacts may be found [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Communication/Z0-Phone-details.pdf here]. ---- == Agenda: == 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-13 last meeting]: * **KL**: Liaise to develop concept for polishing. * **Ongoing**. * **KL**: Define light exclusion scheme for 527. * **Done**. Progress since last week: occupants of offices beyond the 527 lab informed and on-board with need to exclude short-wavelength light. OK now to plan to do the "yellow out". Specification of material sourced by AK passed on to KL. * **AK**: Prepare paperwork necessary to gain permission to work with source in 527. * **Ongoing.** * **AK**: Pass details of second laptop to KL so that delivery can be followed in AK's absense. * **Superceded**. Laptop has now arrived. 2. Baseline schedule and progress against schedule: KL/HTL \\ * [raw-attachment:2019-08-21-SmartPhantom.pdf Progress against baseline schedule]. 3. Mechanical design/manufacture update: JT for LC \\ 4. Control system and SciWire readout update: AK \\ * No report this week as AK is on leave. Item left for future reference. 5. Simulation/analysis update: HTL \\ * [raw-attachment:meeting.pdf Material/Glue Simulation Update]. 6. Next steps \\ 7. DONM \\ * 28Aug19 8. AoB \\ ----