= SmartPhantom meeting: Wednesday 14^th^ August 2019, 11:00 BST = == Notes: == **Present:** KL, JT, AK, HTL 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-06 last meeting]: * **KL**: Liaise to develop concept for polishing. * **Ongoing.** Keep action to make sure it stays in our minds. * **KL**: Define light exclusion scheme for 527. * **Ongoing.** Will use conbination of plastic covers. Need to liaise with occupants of 527 and the offices next door. AK will forward information to KL who will order additional material. * **KL**: Inform MP of present design of support mechanism and discuss/identify any issues. * **Done.** AK, HTL, and KL met MP on 13Aug19. The scheme proposed by LC was discussed and accepted in principle. It was //agreed// to propose the following modifications to LC: * Station 1 (counting from the beam direction) should be mounted independently so that it remains in a fixed, reference location during the exposures. * Stations 2 to 5 (assuming we use 5) should be mounted separately with a mounting arrangement that allows the required variety of positions to be used. * The mounting scheme needs also to have some fixing mechanism. * **AK**: Prepare paperwork necessary to gain permission to work with source in 527. * **Ongoing.** AK has been liasing with the RPA at Imperial to generate the necessary paper work. Outstanding items include the personnel registration. 2. Baseline schedule and progress against schedule: HTL \\ * [raw-attachment:2019-08-14-SmartPhantom-schedule.pdf Progress against baseline schedule]. * Points noted: * LabView: testing of code developed by AK using the stages in 527 did not work. LabView was not able to identify stages. Example executable works OK; so stages are OK. * Image analysis: essentially complete, at least for present stage of development. * Confirm with pottoing lab people afternoon. 3. Mechanical design/manufacture update: JT for LC \\ * JT will contact OM to see whether the components have been dispached from the manufacturer. 4. Control system and SciWire readout update: AK \\ * Main LabVIEW interface is being written. Issue is that the first test of communication between the LabVIEW and the stage. * HighSpec laptop now with AK and installation will begin soon. * No delivery time on second LapTop. AK will chase. 5. Simulation/analysis update: HTL \\ * [raw-attachment:meeting.pdf Simulation of Epoxy/Mylar for Potting]. * See slides; points noted: * Prefered scheme (1mm resin on both sides of station) shows detectors absorb more energy. Scheme with mylar layer is better in that energy lost is smaller. * Scheme will be discussed Resin Lab people tomorrow. 6. Next steps \\ * Assemble winding jig and prepare winding assembly by the end of next week. * Define potting scheme so that detailed design can be done when LC is back from holiday. 7. DONM \\ * 21Aug19 8. AoB \\ * None. === Summary of actions: === * **KL**: Liaise to develop concept for polishing. * **KL**: Define light exclusion scheme for 527. * **AK**: Prepare paperwork necessary to gain permission to work with source in 527. * **AK**: Pass details of second laptop to KL so that delivery can be followed in AK's absense. ---- == Meeting details == Blackett 521 (The Tutorial Room) and teleconference Phone details: {{{ UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902 }}} Full list of telephone contacts may be found [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Communication/Z0-Phone-details.pdf here]. ---- == Agenda: == 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/09-06 last meeting]: * **KL**: Liaise to develop concept for polishing. * **Ongoing.** Keep action to make sure it stays in our minds. * **KL**: Define light exclusion scheme for 527. * **Ongoing.** Will use conbination of plastic covers. Need to liaise with occupants of 527 and the offices next door. * **KL**: Inform MP of present design of support mechanism and discuss/identify any issues. * **Done.** AK, HTL, and KL met MP on 13Aug19. The scheme proposed by LC was discussed and accepted in principle. It was //agreed// to propose the following modifications to LC: * Station 1 (counting from the beam direction) should be mounted independently so that it remains in a fixed, reference location during the exposures. * Stations 2 to 5 (assuming we use 5) should be mounted separately with a mounting arrangement that allows the required variety of positions to be used. * The mounting scheme needs also to have some fixing mechanism. * **AK**: Prepare paperwork necessary to gain permission to work with source in 527. * **Ongoing.** AK has been liasing with the RPA at Imperial to generate the necessary paper work. 2. Baseline schedule and progress against schedule: HTL \\ * [raw-attachment:2019-08-14-SmartPhantom-schedule.pdf Progress against baseline schedule]. 3. Mechanical design/manufacture update: JT for LC \\ 4. Control system and SciWire readout update: AK \\ 5. Simulation/analysis update: HTL \\ * [raw-attachment:meeting.pdf Simulation of Epoxy/Mylar for Potting]. 6. Next steps \\ 7. DONM \\ * 21Aug19 8. AoB \\ ----