= SmartPhantom meeting: Wednesday 14^th^ August 2019, 11:00 BST = == Meeting details == Blackett 521 (The Tutorial Room) and teleconference Phone details: {{{ UK: 08082 380274 Austria: 0800 006612 PIN: 5904750902 }}} Full list of telephone contacts may be found [https://ccap.hep.ph.ic.ac.uk/trac/raw-attachment/wiki/Communication/Z0-Phone-details.pdf here]. ---- == Agenda: == 1. Notes and actions from [wiki:Research/Instrumentation/Meetings/2019/08-06 last meeting]: * **KL**: Liaise to develop concept for polishing. * **Ongoing.** Keep action to make sure it stays in our minds. * **KL**: Define light exclusion scheme for 527. * **Ongoing.** Will use conbination of plastic covers. Need to liaise with occupants of 527 and the offices next door. * **KL**: Inform MP of present design of support mechanism and discuss/identify any issues. * **Done.** AK, HTL, and KL met MP on 13Aug19. The scheme proposed by LC was discussed and accepted in principle. It was //agreed// to propose the following modifications to LC: * Station 1 (counting from the beam direction) should be mounted independently so that it remains in a fixed, reference location during the exposures. * Stations 2 to 5 (assuming we use 5) should be mounted separately with a mounting arrangement that allows the required variety of positions to be used. * The mounting scheme needs also to have some fixing mechanism. * **AK**: Prepare paperwork necessary to gain permission to work with source in 527. * **Ongoing.** AK has been liasing with the RPA at Imperial to generate the necessary paper work. 2. Baseline schedule and progress against schedule: HTL \\ 3. Mechanical design/manufacture update: JT for LC \\ 4. Control system and SciWire readout update: AK \\ 5. Simulation/analysis update: HTL \\ 6. Next steps \\ 7. DONM \\ * 21Aug19 8. AoB \\ ----